2022 Construction Projects

Project Description Impact Level Project Status
North/South Bikeway Route Phase 2 of installing a north/south bikeway route along Drain 45 from Seventh Avenue E. to Main Ave. to improve connectivity B SC
The Wilds 21st Addition Developer Requested Infrastructure C SC
Lagoon Decommissioning Reduce sewage odor by decommissioning the sewage lagoons C CA
Northside Regional Sanitary Sewer Collector Rehabilitation Severe deterioration of the manholes within the Northside Regional Sanitary Sewer Collection System requires rehabilitation to prevent failure of the system. Phase 2 will include addressing manholes in this project that were ineligible for repair. A CA
Ninth Street NW Water Distribution Loop Improve water main system along Ninth Street NW corridor B CA
Traffic Signal Installation - 9th St E and 37th Ave S Signal will provide additional traffic control near Sheyenne High School
(City of Fargo is primary on this project)
A CA
Concrete Pavement Repairs (Citywide) Improve pavement conditions on collector and arterial roadways A S/D
Concrete Pavement Repairs (9th St.) Project in partnership with DOT
Improve pavement conditions on collector and arterial roadways
A S/D

Impact Level Legend:

A: Project will cause major traffic disruptions and significant impacts to surrounding properties.

B: Project will cause minor traffic disruptions and minimal impacts to surrounding properties.

C: Project will rarely or never cause traffic or property disruptions.

Project Status Legend:
For more information about the project status legend, click here

NS: Not Started
P/S: Preliminary and/or Scoping
S/D: Study and/or Design
CA: Construction Administration
SC: Substantially Compete
X: Closed